Page 192 - tmp
P. 192
Too Smooth Entertainment
• The routing to each of the entrances is signed along each of the above roads and
follows similar signage schemes used the _______________ provide the signage.
The signs will be ___________coded. All routing signs and signs associated with
the clearways and any road closures will be provided to the relevant standards.
Road Closures and Onaway Orders
• Road closures are applied for to assist in the management of traffic at the Festival.
They are discussed and agreed with the police, local parish councils, and the County
Council Highways Dept.
Route signage
• Route signage into the site will concentrate on the following categories.
• Those with a specific coloured vehicle entrance to get to members of the public
looking for public parking drop off point
• Buses, coaches and disabled will only be directed when closer to the relevant
vehicle entrance.
• Additional signage within the village of Billericay to advise of any weight
restrictions for HGV vehicles, direct festival vehicles and pedestrians and signage to
enforce the various clearways and road closure orders will be put in place.
• There will also be a number of diversionary routes for through traffic using the A —
_____ and A____________ These signs will advise through traffic on those routes to
avoid the area of the festival and direct traffic to use alternative routes. All routes
will be agreed in advance with the County Highways and the police.
• The details of signage are agreed ___________with signage Contractors the
contractors are supplying relevant details and costs.
• Too Smooth Entertainment Festival signs will have the heading Too Smooth
Entertainment FESTIVAL to enable drivers to pick up the route signage quickly
Signage is to advise delivery drivers not to access the site via or either___________
The AA and Rac break down teams will provide:
Labelling
• (TO BE UPDATED)
Traffic Lights
• (TO BE UPDATED)
Pedestrian Access
184