Page 25 - 5. 2015 New 26-05-21 No Table
P. 25
The banging Continued: -
INTERIM CONDITIONS GOT GRANTED
Helping the Community Hall
Police lied and said that I got served the Asbo folder, so I got placed on an Injunction
Order!
Building my Court Case Defence for the Asbo!
Building the catalogue with Josh!
Issues with Housing Disrepair!
Working on My Website!
18/01/2015
• Disrepair!
• The 2nd Curfew for the Asbo Interim Order Condition’s got granted in Error!
• The banging at Me Continued!
--
The banging Started!
Debbie Andrews (responsible)
Stain Curtis (responsible)
Mathiyalagan (Responsible)
All-Day and All-Night!
The true integrators whom are members of my neighbour’s portrayed deceitful Defensive
rolls for their own doing and lack of my well-being!
The Enfield Homes and the Enfield Council staff aloud the occupiers of 117 and 113 and 111
Continued to victimizing me by
Stain knocked on my letter box and waking me up when he is leaving his premises to get his
newspaper in the mornings, like a person playing the game called knock down ginger!
Eavesdropping, / Heedfully aurally perceiving were I am in my abode and then chasing me
around into each room as listed, while banging on the floor with objects!
Victimizing me with intent of utilizing the same reiterated items of the building fixtures to
have tortures effects on me within my rented habitation is inequitable living circumstances!
Debbie bangs when she is drunk with the occupiers of 117 the Mathiyalagan family and
withal Stain Curtis off 111 Burncroft Avenue and perpetuate to Slamming the dihydrogen
monoxide tap on and off, causing damage to my health and the buildings fixtures at an
unacceptable rate!
Slamming the main, communal ingress door closed!
Slamming their own living room, door closed!
Slamming their own bedroom, door closed!
Summary!
Disrepair!
The problems such as my heating, Sound defaults, and the damp taking over all of the rooms
in the premises, so that I cannot get any enjoyment out of my home each day that goes by!
Time Spent Building.
In the background of everything going on I continued working on organising a Build and
Breakdown Event Controls Policy and possible subcontractors and I continued to Study and
finish at the Time Start: 07:00Am and Time End: 03:30 Pm!