Page 825 - 5. 2015 New 26-05-21 No Table
P. 825
24/04/2015
The Banging Continued: -
INTERIM CONDITIONS GOT GRANTED
Helping the Community Hall
Police lied and said that I got served the Asbo folder, so I got placed on an Injunction
Order!
Building my Court Case Defence for the Asbo!
Building the catalogue with Josh!
Issues with Housing Disrepair!
Working on My Website!
24/04/2015
• Disrepair!
• The 2nd Curfew for the Asbo Interim Order Condition’s got granted in Error!
• The banging Continued!
--
The banging Started!
Debbie Andrews (responsible)
Stain Curtis (responsible)
Mathiyalagan (Responsible)
All-Day and All-Night!
I called them to get left Guarded but with no satisfaction being granted in this rightful
delegation!
The Enfield Homes and the Enfield Council staff aloud the tenants of 117 and 113 and 111
Continued to victimizing me by
They all mentioned in the addresses of 113 and 111 Burncroft Avenue woke me up on
purpose by dropping articles on to their own wooden flooring to make loud banging noises!
117 Slamming the main, communal entrance door closed!
117 and 113 Slamming their own living room, door closed!
117 and 113 Slamming their own bedroom, door closed!
Stain banged on the kitchen wall again with intent of victimising me on a full 24-hour
assaults!
117 and 113 keep slamming their own living room, window continually opened and closed
like to explain a person making competitive beats out aloud!
Summary!
Disrepair!
I cannot take the cold conditions and damp smell in my home any longer, the conditions
make me sick all the time and I keep being sick in the toilet and catching the flu due to the
damp!
Disrepair!
In the background of everything going I continued working on creating a new and up to date
event Electrical Systems Policy and I continued to Study and finish at the Time Start: 07:00
Am and Time End: 03:30 Pm!