Page 1102 - 6. 2016 Diary 1st half New 26-05-21 No Table
P. 1102

113 - 117 and 111 today kept on Banging with objects onto the internal main buildings walls
               and floors, so to intimidate surely me and maybe others living close by whom may be present
               to an extent only worthwhile for the perpetrators selfless glory, In them perpetrators knowing
               that their behaviour would only leave all those getting victimized towards getting left by their
               wrongful actions as to being put into a state of a mental health patient and not rightfully with
               this occurring within mine and their rented or paid for homes!
               The Mathiyalagan family and also Stain Curtis off 111 Burncroft Avenue continue to
               Slamming the water tap on and off, and now with George Quinton also involved I continue to
               document their Hate Crime towards me and report it to the relevant persons without any fair
               process of support and this is causing damage to my health and the buildings fixtures at an
               unacceptable rate!
               They all mentioned in the addresses of 117 Burncroft Avenue keep Dropping articles on to
               their own wooden flooring to make loud banging noises all day and night towards me and the
               floor has not gotten fixed correctly in the address of 113 after Debra Andrews moved out,
               making me still suffer as George has taken over!
               117 - 113 and 111 Slamming the main, communal entrance door closed!
               Stain will not stop banging on the kitchen wall with intent of victimising me on a full 24-hour
               assault in collaboration with the other named in the address of 113 and 117!
               Address of 117 Burncroft Avenue attacking me by the continual dismay of the kitchen draw
               being slammed shut or opened either way it got effectually, closed, to then anon after aurally
               perceive the sharpening of the kitchen utilities knifes to a fictitious extent to make a
               constructive sense of logic and reason, visible for explication of any benevolent character of
               themselves with the time need to look after an Adelson in today’s word safely!

               Summary!
               My Heart has really started to hurt me every day, I am having an early aged mild heart
               attacks because of what Debra Andrews and the Mathiyalagan Markandu family as well as
               stain Curtis and George Quinton get and got away with, inclusively of what the police and
               local council members are getting away with each day by holding me hostage with no first
               hand witness and then on allowing my estate members to carry out their hate crime in a cover
               up to send me crazy or to an early death by flushing the toilet below me and bagging at me
               causing me sufferings and no peace also letting the named attack me when I am in the
               bathtub and getting undressed and this does not stop their I continue to get assaulted with the
               water taps getting slammed on and off  causing a loud bagging sound at a fast rate and
               slamming object and or jumping on the floorboards above my head damaging my work
               studies and private family life and making me a Vulnerable  person!
               I have also had a lot of problems with eating because of what they keep all doing to me!
               My dog has eating its paws because of what the old tent of 113 and now the new tent of 113
               and also that of the tents in the addresses of 117 and 111 are getting away with I have taken
               pictures of the damage this is doing to us in this flat!

               Disrepair!
               The conditions of the damp in my flat make me continue to suffer and I have to spend no re
               money to stay warm in my flat and in maintaining it than I should due to these issues not
               getting fixed in time!

               Time Spent Building.
               In the background of everything going I continued working on creating a new and up to date
               Event Management System for my Company and Policy and I continued to Study and finish
               at the Time Start: 07:00 Am and Time End: 03:30 Pm!
   1097   1098   1099   1100   1101   1102   1103   1104   1105   1106   1107