Page 879 - 6. 2016 Diary 1st half New 26-05-21 No Table
P. 879
The tenants of 117 and 111 Continued to victimizing me by-
Continually, repeating to flushing the toilet when I am in the bathroom being sick in my toilet
because they made me ill!
Victimizing me by Banging above the Barth to which I get into, once they understand that I
have stopped running the water for my bath to be ready, this is after they wait for any other
tail, tail signs that I have gotten undressed and soaked within the water, creating a brutal
attack against my person in their wrongful self-gains!
The continual intimidation of the kitchen draw being slammed shut or opened either way it
got effectually, closed, to then soon after hear the sharpening of the kitchen utilities knifes to
an unrealistic extent to make a constructive sense of logic and reason, visible for explanation
of any good character of themselves with the time need to look after an Adelson in today’s
word safely!
117 - Slamming the main, communal entrance door closed!
My Repair issues should not get pushed aside and then hidden without being correct by the
Enfield Council and the Enfield Homes, as keeps happening to me at my losses out of life
Summary!
I feel Ashamed of the way the responsible people have left me to feel!
The Metropolitan Police constabulary’s employees made me go through Intentional infliction
of emotional distress by their decisions and actions at no fault of my own alongside in joint
circular with the Enfield Homes and the Enfield Council's employees!
Disrepair!
A full detailed response needs to take place to why I get left to suffer like this because of the
Heating and damp issues in my rented home even low I keep reporting them as emergency
concerns and the reasons to why these problems get left for such a long duration of time?
Time Spent Building.
In the background of everything going I Started working on Creating a new and up to date
event Bomb Threat Procedures Checklist and Policy and I continued to Study and finish at
the Time Start: 07:00 Am and Time End: 03:30 Pm!
My mother also continues to work on building my company website for me with others at the
Time Start: 09:00 and Time End: 14:00!
Working at Home doing Court Case Defense Work!
I spent time and resources costing expenditure with my mother also building my defence
case, against the allegations getting put against me at the Time Start: 12:00 Am and Time
End: 06:00 Am!
04/04/2016
ASBO mentioning took place!
Issues with My Neighbours and Housing Disrepair!
Working on the Court Case Defence!
The Anti-Social Behaviour Order Case and the Verdict got made Guilty against me in
error and the conditions got imposed against me till late 2020!
The Banging Continued: -
Building the catalogue
Working on My Website!
04/04/2016

