Page 614 - 2015 2nd Half No Table
P. 614
Disrepair!
The Enfield Council and the Enfield homes have left the disrepair of the damp and heating
issues for so long that the damp water shows on the electrical wiring systems and sometime
causes them to overloaded making the electrical sockets dangers and causing further damage
to my personal property, such as my TV that also has mould growing over it, as much as I try
my best to keep it clean and well ventilated!
Time Spent Building.
In the background of everything going I continued working on Creating a new and up to date
event Emergency Procedures safety policy and I continued to Study and finish at the Time
Start: 07:00Am and Time End: 03:30 Pm!
My mother also continues to work on building my company website for me with others at the
Time Start: 09:00 and Time End: 14:00!
Working at Home doing Court Case Defense Work!
I spent time and resources costing expenditure with my mother also building my defence
case, against the allegations getting put against me at the Time Start: 12:00 Am and Time
End: 06:00 Am!
04/11/2015
Debra Went Away!
Nash stayed at mine!
Stain and the Mathiyalagan and Co got much Worse!
Issues with My Neighbours and Housing Disrepair!
Working on the Court Case Defence!
The Anti-Social Behaviour Order Case and the Verdict got made Guilty against me in
error and the conditions got imposed against me till late 2020!
The Banging Continued: -
Building the catalogue
Working on My Website!
04/11/2015
• Disrepair!
• The Asbo Order got granted in Error with Full Conditions against me and Fraudulently!
• The Banging at me got much worse!
• Debra got moved
Into a Hotel by the Council!
--
The banging Started
Stain Curtis (responsible)
Mathiyalagan (Responsible)
Time: All-Day and All-Night whenever they knew that I was indoors!
The occupiers of 117 and 111 Continued to victimizing me by: --
After the mundane daily routine now of the already designated assailing me in my bathroom
after waking me up transpired today!