Page 155 - Pages from 8. 2017 New 26-05-21 No Table- 3rd Half
P. 155
continued her conversation by expressing; if she had to she would lift the rest of the flooring
up in my flat to prove the pipe work was all in place and show that the rest including the
bedroom and bathroom were still there.
At this the lady explained while still on the phone that there is no need for what my mother
told her to happen and that the council will replace the heating system, but the problems did
not stop for me there again and as a continuation the Enfield Council employees then sent the
surveyors out to my flat to oversee and then order to replace the heating system but survivors
or council employees had told the sub-contractors that I had removed all the pipe work, to the
point no one wanted to come out and do the work.
The sub-contractor was very shocked to see all the pipework still in place and also said that
he is glad that he meets me and saw the truth himself.
I also worked on the
Confidentiality Agreement Between; - Company Director Simon Cordell of Too Smooth
LTD and ******* and I continued to Study and finish at the Time Start: 08:00Am and Time
End: 10:00Pm!
My mother worked on building my company website for me with others at the Time Start:
09:00 Am and Time End: 07:30 Pm!
1525,
flat-damage-2006-onwards.doc
In 2006 when I first moved into my flat it never seemed to be in a bad state of living
condition, due to it being decorated by the Enfield Council ready for me to move into. After
the first few months, I started to notice the walls and ceilings had started to get covered in
mould and then on started to take picture evidence of my sufferings.
I declared to the relevant body’s that my flat had really bad damp and it took mutable calls
and emails to the Enfield Complaints departments reasonable persons whom over that period
of time sent many different visiting surveyors to get the emergency graded problems fixed
and without any fault of my own this somehow took a couple of years to get rectified with a
disappointing completion date of the year of 2008.
This damp caused me the loss of enjoyment of my flat and damage to most of my personal
property at no fault of my own again I must stress and I had to have a machine in my
bedroom to remove the water before and after the contractors started the important works.
The well needed Industrial water removal machine to dry out flat got installed right away, the
only time I got allowed into the bedroom was to empty the bucket of water the machine
collected that did, in the beginning, fill up many times a day, as the months continued to pass
by the amount of unneeded stored water became less and less, right up until the council and
the Enfield homes reasonable persons where able to start the needed work.
By this time the initial problem of cause for the damp had gotten documented to be because
of bad ventilation within the estates premises around the year of 2007 and as a resolution to
the problem an air ventilation system got agreed to get adapted to the premises, the works
involved in the installation of this air system meant that I had to have large circular holes cut
into my kitchen window that leads to my back garden and that of my bathroom window that
leads to the main street, the hardware to the ventilation system got delayed to get installed for
a much longer time frame than anticipated in fact it took another two or three years latter later
in the year of 2010, leaving my home insured and this happened at no fault of my own yet
again, I got left with holes in my windows.
Even low thought the flat stayed in an unliveable state of condition through the years of 2006
till 2008 I got made to live in my flat, and after some of the disrepair issues got fixed with the
walls and ceilings inside of my flat continued to suffer from the damp issues due to the
floorboards going rotten after the first repairs, causing sinking floors and this once again
made the flat unliveable due to the dangerous risks involved from the year 2008 till 2010.