Page 796 - 6. 2016 Diary 1st half New 26-05-21 No Table
P. 796

The banging Started!
               Flat – 113 – Empty!
               Stain Curtis (responsible)
               Mathiyalagan (Responsible)
               All-Day and All-Night!
               There is no place for Sceptical codes of practice in our legal system!
               The occupiers of 117 and 111 Continued to victimizing me with
               They all mentioned in the address of 117 Burncroft Avenue woke me up on purpose
               Then victimized me by Banging above the Barth to which I get into!
               Stain banged on the kitchen wall again with intent of victimising me on a full 24-hour
               assault!
               Slamming the dihydrogen monoxide tap on and off causing damage to my health and the
               buildings fixtures at an unacceptable rate!
               117 keep slamming their own living room, window continually opened and closed like to
               explain a person making competitive beats out aloud!

               Summary!
               My Heart has really started to hurt me every day, I am having an early aged mild heart
               attacks because of what the Mathiyalagan family stain and Debra with the police and local
               council members are getting away with each day holding me hostage with no first hand
               witness and the estate members flushing the toilet attacking me when I am in the bathtub and
               getting undressed all so playing with the water taps and banging above my head damaging
               my work studies and private family life and making me a Vulnerable  person!
               I have also had a lot of problems with eating because of what they keep all doing to me!
               My dog has eating its paws because of what 117 and 111 are getting away with I have taken
               pictures of the damage this is doing to us in this flat!

               Disrepair!
               I would like a fair result from the Enfield Council fixing my home to the right living
               standards so that I do not get left to suffer like this!

               Time Spent Building.
               In the background of everything going I continued working on creating a new and up to date
               event Action in an Emergency Policy and I continued to Study and finish at the Time Start:
               07:00Am and Time End: 03:30 Pm!
               My mother also continues to work on building my company website for me with others at the
               Time Start: 09:00 and Time End: 14:00!

               Working at Home doing Court Case Defense Work!
               I spent time and resources costing expenditure with my mother also building my defence
               case, against the allegations getting put against me at the Time Start: 12:00 Am and Time
               End: 06:00 Am!

                                                       08/03/2016

                                  Issues with My Neighbours and Housing Disrepair!
                                          Working on the Court Case Defence!
                 The Anti-Social Behaviour Order Case and the Verdict got made Guilty against me in
                             error and the conditions got imposed against me till late 2020!
                                               The Banging Continued: -
   791   792   793   794   795   796   797   798   799   800   801